Click here for Senergy's training courses
Senergy’s formation integrity team (FIT) is one of the world’s leading independent geomechanics groups.
A combined experience of 200 years and no corporate pressures to sell hardware, tools or logging services, allows Senergy to offer 100% objective and pragmatic advice.
Formation Integrity
Experience
We have worked on a wide range of sand management, wellbore stability, production enhancement, PWRI and cuttings re-injection projects for many operators, from small independents to super majors.
Geographical Experience
UKCS (with particular expertise in the Southern North Sea gas province); Western and Eastern Europe; North/Latin America (US and Venezuela); Asia (India, Pakistan); SE Asia (Malaysia, Vietnam, Indonesia, Thailand); and Australia.
Wellbore Stability
Senergy’s geomechanics team combines its skills to enhance wellbore stability. We allow you to drill your well and keep it stable, through the overburden and reservoir; hence minimising non-productive time.
Sanding Prediction and Control
FIT is wholly dedicated to optimising clients’ sand management strategies, from drilling to abandonment. We assess the probability of sand
failure and sand production over the life of any well, and deliver the practical advice required to alleviate sand production concerns.
The formation integrity team blends its skills with
Senergy’s production technology and formation damage specialists, to optimise sand management
decisions. To complete the package, we assess
and design formation stimulation and production
enhancement opportunities, while evaluating thermal fraccing, produced water and cuttings re-injection, and geomechanical challenges of CO2 disposal schemes.
Formation Damage
The term ‘formation damage’ covers any reduction in near wellbore
permeability, which results from activities such as drilling,
completion, production, injection, attempted stimulation or any other
well intervention. We can assess the risk and mitigate such damage
during drilling and production, in addition to examining the extent of
subsidence, compaction or casing damage in high depletion scenarios.
Production Enhancement
Senergy’s production enhancement success is derived from a unique blend
of skills which focus on the key connection between the reservoir and
wellbore. From pore scale identification of damage mechanisms through
to optimum sandface completion design, we use extensive geological and
engineering experience to increase production, and optimise injection